This report will analyze a proposal on how Woodbridge Foam could become more
competitive through improvements in technology. This includes the saving of the
companies money, shortening the design time for new products, decreasing quoting
time and improving quality overall. By implementing a company wide CAD system,
which would be networked together with each customer and all plants, these
improvements could be achieved. Research will include interviewing various
employees as to how business is done and what influences the winning or loosing
of a contract. Research will also include study of both customer and
competitors systems.
Project Scope & Current Evaluation Goals Supported by CAD Initiative:
In converting to a completely independent CAD system, there are a few aspects of
operation which would be greatly improved. The first of the improvements would
be the elimination of paper communication. The need to transfer large drawings
using mylars would cease to be, thus helping provide a paper less environment.
Another improvement as a result of CAD would be that of achieving much tighter
tolerances in building new products. Using a CAD system, part designs could be
received in an electronic format such as a math model. These models are
currently in use by customers such as GM, BMW and Mercedes. The effect of
having math models of all new products would enable a quicker turnaround in both
quoting and production of products. CAD Vendors & Hardware Suppliers: Upon
observing the various systems used by several customers and suppliers, the major
CAD vendors worth consideration have been identified. Manufacturers of high
quality workstations which have been distinguish are: Hewlett Packard (HP) IBM
Silicon Graphics (SGI) SUN Premium, fully functional CAD solutions are: CATIA
(Dassault / IBM) Computervision (Computervision / TSI) SDRC (SDRC / CAD
Solutions) Unigraphics (EDS) Current System Description Success Factors: In
implementing a new, otherwise foreign system into an established habitual way of
doing things, there are several success factors which must be examined. If
these factors are carefully thought over, a favorable shift from old to new may
be obtained. Some critical success factors are as follows: Vendor availability
- Will the chosen system supplier be readily available for technical support?
Product engineering acceptance – Will those who are set in their ways be willing
to abandon their habitual manner of operating? Training – Thorough training of
all related employees must be completed before introduction of the new
system. Data management – A new manner of recording all vital information must
be established and proper procedures documented. Customer interface – Will the
chosen system be compatible with those used by our customers and will needed
data be easily convertible?
Company Weaknesses:
Currently, there are many aspects of our situation which present problems in
coping with changing times, which in turn affect the development of technology.
Some weaknesses in the company which curtail our affiliation with the
developmental progress of our customers and suppliers are: We cannot easily
accept electronic data; We must deal in manual drawings; We have many copies of
similar drawings; We have multiple ECN levels; We have minimal CAD knowledge; We
must perform manual volume calculations.
Threats to Business:
If procedures are not taken in order to improve on the present company
weaknesses, there are bona fide threats which could potentially harm future
progress and business. Once the weakness in the company have been effaced, the
following threat to our business may be eliminated or greatly reduced. The
immediate threats are: Suppliers may assume the design role; Competitors able to
accept electronic input; No business with new products; Deterioration of
communications; Lost productivity Process Description: As in most large
corporations, our process generally follows a standard order of operations.
There are several departments or areas which have functions. Based on the
function of a department or area, a focus area is established and followed.
Department/Area Function Focus Area
Customer
Designs seat
Product Engineering
Designs tool to manufacture seat
Supplier
Builds tools and supplies components needed to manufacture and construct seat
Product Evaluation & Costing
Costs seat based on foam and components used, manufacturing costs and assembly
Purchasing
Locates seat component suppliers and oversees development and manufacture of
components
Plant
Manufactures and assembles seat
Quality Control
Ensures that products meet our own and customer standards
Sales / Marketing
Processes orders and manages overall customer relationships
New System Requirements CAD System Requirements:
The CAD system which is chosen must be capable of performing several specific
tasks. In order for a new system to be of any use to the company and an aid to
its advancement, it must present an improvement in various areas. Some of the
short term requirement of a new CAD system are: Capable of 3D modeling including
solids; May be used for simple or complex drafting applications; Suited to
quickly perform volume calculations; Apt to translate various forms of math data.
Product Evaluation & Costing (P.E.C.) Requirements:
With respect to all the various areas of the company, the role of the P.E.C.
department is one of the most important in the area of profit. Once the costing
department receives a part request from a customer, it is the responsibility of
the costing department to ensure that the life cycle of the part development is
managed cost efficiently. When a current product undergoes an engineering
change, it is the responsibility of the Costing team members to note the changes.
The product must be re-costed, accounting for variances in foam and components.
If an increase in foam is noted, the change must be calculated. Using manual
calculations, the new part volume is derived and the customer is charged
accordingly.
Because foam variances are obtained manually, customers may at times, not be
fully charged for the added cost of foam. Using a CAD system to perform a
volume calculation, the answer would be definitive. The time needed to ship a
print is approximately two days. If math models of products were sent via E-
mail, the information needed by the costing department would be obtained two
days earlier. Once complete, a costing package would in turn, arrive at a plant,
also two days earlier from costing. In effect, a total of four days could be
eliminated from the time needed to begin manufacturing a product. Solution
Evaluation & Recommendation Benefits of CAD System In utilizing a CAD system,
there are many areas of operation which are directly or indirectly affected.
Because of the speed and accuracy with which a professional CAD system operates,
time, and thus money, may be saved. Potential CAD project benefits include:
Improved accuracy in quotes and design; Reduction in copying and courier costs;
Faster and more accurate calculations of complex volumes; Management of
expanding drawing database; Improved electronic communication with customers and
suppliers.
Recommended Vendor/Supplier
Based on thorough presentations made to executives of Woodbridge Foam by each
candidate and the penetration of these amongst key Woodbridge customers, it is
recommended that Unigraphics be implemented as the solution. The Unigraphics
system is currently used b 40% of Woodbridge customers. This system is also
capable of performing all of the previously mentioned tasks such as 3D modeling,
drafting, volume calculations and translating different forms of math data.
Justification of CAD & Unigraphics
CAD justification includes: Elimination of Mylars; Encouragement of a paper-less
environment; Reduction in copy and reproduction costs; Reduction in courier
costs; Faster and more accurate part volume calculations.
Unigraphics justification includes: Used by key customers such as Chrysler and
GM; Ability to convert data used by all customers; Extra commitment and
availability for technical support; Extensive research into company prior to
presentation.
Work Station Cost:
One time costs for one Workstation:
Unigraphics Software License $30 000
Hewlett Packard Workstation $45 000
EDS Assistance (Assessment/Help) $ 5 000
Training (UG Education) $10 000
Consulting Assistance $ 7 500
Printer and Plotter $30 000
Hummingbird/Exceed PC Access Software $10 000
One time total costs $137 500
Annual Maintenance Costs: $3 750 Cost Reductions: As previously mentioned, the
implementation of a CAD system will reduce costs in several areas. By
eliminating the need for physical prints, the cost of reproducing and shipping
prints will be eliminated. Some potential cost reductions in dollars are:
Prints: 35,000
Mylars: 75,000
Courier: 5,500
Travel: 16,000
Plants (saved travel): 90,000*
Productivity Improvement 75,000*
TOTAL SAVED: 296,500
Productivity Improvements:
There are some improvements in productivity which do not present a monetary
value. These improvements however; will benefit the company and customer
relations. These non-monetary productivity improvements are: Improved accuracy;
Improved customer satisfaction; Support for higher tolerance of products;
Improved on-line access to information; Improved internal communication between
Woodbridge departments.
Conclusion:
As advancements in technology continue to be the norm, it is essential that
those who wish to remain competitive, adhere to these advancements. In the case
of the Woodbridge Foam Corporation, maintaining and equal standing with
technological advancements will allow for improvements in the company as a whole.
Cost saving may be incurred in the areas of print and courier costs; while the
need for paper transference is eliminated. Tolerances, quoting time and an
overall improvement in quality will in turn improve the satisfaction of our
customers. Because of these advancements in technology within the company, the
saying “a satisfied customer is a return customer” may be brought to life.